ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 45 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2016-2025 Ten-year network development plan of BTG)
Regulated Regulated
Part of NDP
NDP Number
Section 5.1. (5.1.1)
No No
Exemption Granted
05/2017
Currently PCI
Yes (6.25.4)
Permitting Supply Contracts FID Construction Commissioning
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
06/2022
2022
2022
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Replacement of 20 km of gas pipelines (2x10km), DN 1000 in the section CS Strandja – a new IP with Turkey. new looping and additional power to existing compressior station
CS Strandja – a new IP with Turkey.
1,000
20
1,200
50
10
Looping CS Provadia – Rupcha village
Total
70
10
PCI Details
PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Expected Gas Sourcing Caspian Region, Russia, LNG (), Southern gas corridor gas sources; European gas hubs; Black sea shelf gas; Domestic production;
Benefits
Main Driver
Others
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B | 41