ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 1 of 620

Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)

TRA-N-021 Update Date

Project

Pipeline including CS

Non-FID Advanced

06/05/2016

The Bidirectional Austrian Czech Interconnection (BACI) will be a new infrastructure directly connecting the Austrian and Czech market. It will be connected to the existing Czech transmission system via CS Břeclav (NET4GAS s.r.o.) and to the Austrian transmission system via Baumgarten (GAS CONNECT AUSTRIA GmbH). The project BACI will enable capacity transmission for the first time between these two EU member states and it will facilitate better market integration between Austria and the Czech Republic. The project BACI will also increase the overall flexibility of the Czech, Austrian and also Polish system by diversification of gas supply routes and by connecting UGSs in the Czech Republic and Austria.

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2020

From Gas System To Gas System Capacity

201.4 GWh/d

Gas Connect Austria GmbH

AT

CZ

Comment: New bidirectional IP connceting the Czech and the Austrian Virtual Trading Point . Maximum capacity will be between 750,000Nm³/h and 1,480,000Nm³/h; conversion from Nm³/h to kwh/h with a GCV of 11.19. Gas Connect Austria GmbH 2020 CZ AT Comment: New bidirectional IP connceting the Czech and the Austrian Virtual Trading Point . Maximum capacity will be between 750,000Nm³/h and 1,480,000Nm³/h; conversion from Nm³/h to kwh/h with a GCV of 11.19.

Poštorná / Reintal

201.4 GWh/d

Sponsors Pipeline on Austrian territory GAS CONNECT AUSTRIA GmbH Pipeline on Czech territory NET4GAS, s.r.o

General Information

GAS CONNECT AUSTRIA GmbH Gas Connect Austria GmbH

Promoter

100%

Operator

Host Country

Austria Planned

100%

Status

Website Publication Approval Status

Approved

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B | 5

Made with FlippingBook - Online catalogs