ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 38 of 620

Looping CS Valchi Dol - Line valve Novi Iskar

TRA-N-592 Update Date

Project

Pipeline including CS

Non-FID

Non-Advanced

27/05/2016

Looping to CS Valchi dol – line valve Novi Iskar: Modernisation of the national gas transmission network norther semi-ring with the construction of 383 km looping with a diameter of Dn 700 from CS Valchi dol to line valve Novi Iskar. The realization of the project will ensure new exit capacity of 4 bcm/y (128,3 GWh/d) in the direction to Romania (through IBR) and Chiren UGS (for transmission during injection and withdrawal amounting to 500 mcm/y). In the context of the European objectives to build an interconnected and single pan-European marker, the realization of the presented projects, forming the gas hub concept, is in line with the projects for the development of the Southern gas corridor and in full compliance with the plans for development of gas infrastructure in Europe to enhance the security of supply and the diversification of natural gas supply sources.

Description

Regulatory Decisions and similar material conditions

Sponsors Bulgartransgaz EAD

General Information

100%

Promoter Operator

Bulgartransgaz EAD Bulgartransgaz EAD

Host Country

Bulgaria Planned

Status

Website

Project's URL

Publication Approval Status

Approved

Enabled Projects

Project Code Project Name UGS-N-138 UGS Chiren Expansion TRA-F-057 Interconnection Bulgaria–Romania TRA-N-593 Varna-Oryahovo gas pipeline TRA-N-594 Construction of a Looping CS Provadia – Rupcha village

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

34

Made with FlippingBook - Online catalogs