Looping CS Valchi Dol - Line valve Novi Iskar
TRA-N-592 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
27/05/2016
Looping to CS Valchi dol – line valve Novi Iskar: Modernisation of the national gas transmission network norther semi-ring with the construction of 383 km looping with a diameter of Dn 700 from CS Valchi dol to line valve Novi Iskar. The realization of the project will ensure new exit capacity of 4 bcm/y (128,3 GWh/d) in the direction to Romania (through IBR) and Chiren UGS (for transmission during injection and withdrawal amounting to 500 mcm/y). In the context of the European objectives to build an interconnected and single pan-European marker, the realization of the presented projects, forming the gas hub concept, is in line with the projects for the development of the Southern gas corridor and in full compliance with the plans for development of gas infrastructure in Europe to enhance the security of supply and the diversification of natural gas supply sources.
Description
Regulatory Decisions and similar material conditions
Sponsors Bulgartransgaz EAD
General Information
100%
Promoter Operator
Bulgartransgaz EAD Bulgartransgaz EAD
Host Country
Bulgaria Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name UGS-N-138 UGS Chiren Expansion TRA-F-057 Interconnection Bulgaria–Romania TRA-N-593 Varna-Oryahovo gas pipeline TRA-N-594 Construction of a Looping CS Provadia – Rupcha village
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM