ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 22 of 620
NDP and PCI Information
Schedule
Start Date
End Date 06/2011 01/2017 12/2017 05/2017
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2016-2025 Ten-year network development plan of BTG)
Regulated Regulated
Part of NDP
Feasibility
01/2015 01/2017
NDP Number
Section 5.3 (5.3.1)
FEED
Not Relevant Not Relevant
Market Test
Exemption Granted
Currently PCI
Yes (6.20.2.)
Permitting Supply Contracts FID
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
CBCA Decision Market Survey
No
01/2019 12/2021
Not Relevant (no CBCA decision)
Construction
01/2020
Commissioning
2022
2022
Technical Information (UGS)
Storage Facility
UGS Chiren
Storage Facility Type
Aquifer
Multiple-Cycle
No
Working Volume (mcm)
450.00
450
PCI Details
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at supplying directly or indirectly at least two Member States
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
No
Competition, Market Integration, Security of Supply
The project for its expansion aims on one hand at creating conditions to ensure security of supplies to Bulgarian users and users in the countries from the region, and on the other - UGS Chiren development as commercial gas storage in an interconnected regional and Europe- wide market, as UGS Chiren is an integral part of the plans for development of the regional gas system consisting of interconnections, LNG terminals, storage facilities. In the medium term UGS Chiren promises to become a commercial facility with a significant role in competition development in the regional gas market and in provision of additional flexibility of the gas transmission systems at regional level, with a significant contribution to congestion management and seasonal optimization of use of the gas transmission systems.
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP
yes
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM