ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 523 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (TYNDP for the period 2016-2025)

Regulated Regulated

C11

No No

Currently PCI

Exemption Granted

No

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

0.00% 0.00%

Not Relevant (no CBCA decision)

2024

2024

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

R61 Dragonja - Izola

300

10 10

Total

Benefits

Main Driver

Market Demand

Main Driver Explanation Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |