ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 516 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (The project is not included in the currently valid and confirmed NDP (2016- 2025), but it was included in the previous one (2015-2024) and it will also be included in the new one, which is in preparation (TYNDP 2017-2026) and will be confirmed by our regulator expectedly in the next months. )
Regulated Regulated
No No
Part of NDP
Exemption Granted
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
NDP Number
2022
2022
Currently PCI
No
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
M6 Interconnection Osp
The length is approximately 1.2 km.
250
1
Total
1
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description