UGS Chiren Expansion

UGS-N-138 Update Date

Project

Storage Facility

Non-FID

Non-Advanced

26/05/2016

Capacity increase of the only gas storage facility on the territory of Bulgaria in order to achieve larger gas volumes stored, increased gas reservoir pressures and higher daily average injection and withdrawal flowrates. The project provides for the increase in the working gas volume up to 1 bcm and increase in the injection and withdrawal rate up to 8 – 10 mcm/day.

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2022 2022

From Gas System To Gas System Capacity

61.5 GWh/d 61.5 GWh/d

Bulgartransgaz EAD Bulgartransgaz EAD

STcBGn

BGn

GMS Chiren

BGn

STcBGn

Sponsors Bulgartransgaz EAD

General Information

100%

Promoter Operator

Bulgartransgaz EAD Bulgartransgaz EAD

Host Country

Bulgaria Planned

Status

Website

Project's URL

Publication Approval Status

Approved

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM