ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 527 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (TYNDP for the period 2016-2025)
Regulated Regulated
C8
No No
Currently PCI
Exemption Granted
No
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2022
2022
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
M3/1b Ajdovščina - Kalce
1,100
24 24
Total
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Barriers
Barrier Type
Description
Long lasting and complicated procedures of Spatial planning (National Spatial Plan, SEA and EIA procedures, Environmental consent) as well as the procedure of acquiring the Construction permit (long procedures for land acquisition, etc.)
Permit Granting
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
299
Made with FlippingBook - Online catalogs