ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 52 of 620
Pipelines and Compressor Stations - Alternative Variant
High capacity scenario, starting at Negru-Voda IP at RO-BG border, passing through BG using upgraded existing pipelines to Malkoclar IP at BG-TR border
Eastring - BG-1
Pipeline Section Eastring-BG-1
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Length of used existing pipeline - 259 km
1,200
0 0
0 0
Total
Pipelines and Compressor Stations - Alternative Variant
Low capacity scenario (low in direction N->S), starting at Negru-Voda IP at RO-BG border, passing through BG using upgraded existing pipelines to Malkoclar IP at BG-TR border
Eastring - BG-3
Pipeline Section Eastring-BG-3
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Length of used existing pipeline - 259 km
1,200
0 0
0 0
Total
Pipelines and Compressor Stations - Alternative Variant
Low capacity scenario (low in direction N->S), starting at new IP at RO-BG border, passing through BG using new pipeline to new IP at BG-TR border
Eastring - BG-4
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Data refers to the first stage - capacity 570 GWh/d, in case of increase of capacity up to 1140 GWh/d in 2025, compressor power at level of 374 MW will be needed
Eastring-BG-4
1,400
257
90
Total
257
90
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Expected Gas Sourcing Caspian Region, Norway, Russia, LNG (), Iraq, Iran, Egypt, Israel, Turkmenistan, Kazakhstan, Cyprus, Azerbaijan, Any gas available at Turkish/European HUBs. For dire
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM