ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 51 of 620
Strandzha (BG) / Malkoclar (TR)
712.0 GWh/d
Bulgartransgaz EAD
2025
BGg/BGT
TRe
Sponsors Bulgartransgaz EAD
General Information
100%
Promoter Operator
Bulgartransgaz EAD Bulgartransgaz EAD
Host Country
Bulgaria Planned
Status
Website
Project's URL
Publication Approval Status
Approved
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2016-2025 Ten-year network development plan of BTG)
Not Applicable Not Applicable Not Relevant Not Relevant
Part of NDP
05/2016
04/2017
NDP Number
Section 5.1(5.1,2)
FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Exemption Granted
Currently PCI
Yes (6.25.1)
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
2021
2025
Pipelines and Compressor Stations
High capacity scenario, starting at new IP at RO-BG border, passing through BG using new pipeline to a new IP at BG-TR border
Eastring - BG-2
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Data refers to the first stage - capacity 570 GWh/d, in case of increase of capacity up to 1140 GWh/d in 2025, compressor power at level of 374 MW will be needed
Eastring-BG-2
1,400
257
88
Total
257
88
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
28
Made with FlippingBook - Online catalogs