ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 49 of 620

712.0 GWh/d

Bulgartransgaz EAD

2025

BG/EAR

TRe

Eastring Cross-Border BG/EAR>TR

Comment: Exit means direction BG->TR.

570.0 GWh/d

Bulgartransgaz EAD

2021

TRr

BG/EAR

Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 TRr BG/EAR

Eastring Cross-Border TR>BG/EAR

570.0 GWh/d

Capacity Increments Variant(s) For Information Only Variant : Eastring - BG-1

High capacity scenario, starting at Negru-Voda IP at RO-BG border, passing through BG using upgraded existing pipelines to Malkoclar IP at BG-TR border

Point

Operator

Year 2021

From Gas System To Gas System Capacity

200.0 GWh/d

Bulgartransgaz EAD

BGn

BG/EAR

Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Bulgartransgaz EAD 2021 BG/EAR BGn Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Comment: Transmission between Bulgaria and Turkey via existing transmission system at IP Malkoclar, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 TRi BGg/BGT Comment: Transmission via existing IP Negru-Voda with increase of capacity at lewel of 570 GWh/d, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2021 RO/TBP BGg/BGT Comment: Transmission via existing IP Negru-Voda with increase of capacity at lewel of 570 GWh/d, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BGg/BGT RO/TBP Bulgartransgaz EAD 2021 TRi BGg/BGT Bulgartransgaz EAD 2021 BGg/BGT RO/TBP

Eastring BG Domestic Point

200.0 GWh/d

570.0 GWh/d

Malkoclar (TR) > Strandzha (BG)

570.0 GWh/d 570.0 GWh/d

570.0 GWh/d

Negru Voda II, III (RO) / Kardam (BG)

570.0 GWh/d 570.0 GWh/d 570.0 GWh/d

Bulgartransgaz EAD Bulgartransgaz EAD

2025 2021

RO/TBP BGg/BGT

BGg/BGT

Strandzha (BG) / Malkoclar (TR)

TRe

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

26

Made with FlippingBook - Online catalogs