ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Eastring Cross-Border BG/EAR <> RO/EAR Current TYNDP : TYNDP 2017 - Annex A

Page 48 of 620

570.0 GWh/d 570.0 GWh/d

Bulgartransgaz EAD Bulgartransgaz EAD

2025 2021

RO/EAR BG/EAR

BG/EAR

TRe

Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border, New capacity increment from 4Q 2023 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BG/EAR TRe Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 TRr BG/EAR Bulgartransgaz EAD 2021 TRr BG/EAR

Eastring Cross-Border BG/EAR>TR

570.0 GWh/d 570.0 GWh/d

Eastring Cross-Border TR>BG/EAR

570.0 GWh/d

Capacity Increments Variant(s) For Information Only Variant : Eastring - BG-4

Low capacity scenario (low in direction N->S), starting at new IP at RO-BG border, passing through BG using new pipeline to new IP at BG-TR border

Point

Operator

Year 2021

From Gas System To Gas System Capacity

200.0 GWh/d

Bulgartransgaz EAD

BGn

BG/EAR

Comment: Entry/Exit capacity at domestic points may go up to the level of 200GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Bulgartransgaz EAD 2021 BG/EAR BGn Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 712 GWh/d. Exit means direction RO->BG. Bulgartransgaz EAD 2021 RO/EAR BG/EAR Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BG/EAR RO/EAR Bulgartransgaz EAD 2021 BG/EAR RO/EAR

Eastring BG Domestic Point

200.0 GWh/d

342.0 GWh/d

570.0 GWh/d

Eastring Cross-Border BG/EAR <> RO/EAR

712.0 GWh/d 570.0 GWh/d 342.0 GWh/d

Bulgartransgaz EAD Bulgartransgaz EAD

2025 2021

RO/EAR BG/EAR

BG/EAR

TRe

Eastring Cross-Border BG/EAR>TR

Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border; New capacity increment from 4Q 2023 to the level of 712 GWh/d. Exit means direction BG->TR.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

25

Made with FlippingBook - Online catalogs