ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Eastring Cross-Border BG/EAR <> RO/EAR Current TYNDP : TYNDP 2017 - Annex A
Page 48 of 620
570.0 GWh/d 570.0 GWh/d
Bulgartransgaz EAD Bulgartransgaz EAD
2025 2021
RO/EAR BG/EAR
BG/EAR
TRe
Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border, New capacity increment from 4Q 2023 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BG/EAR TRe Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 TRr BG/EAR Bulgartransgaz EAD 2021 TRr BG/EAR
Eastring Cross-Border BG/EAR>TR
570.0 GWh/d 570.0 GWh/d
Eastring Cross-Border TR>BG/EAR
570.0 GWh/d
Capacity Increments Variant(s) For Information Only Variant : Eastring - BG-4
Low capacity scenario (low in direction N->S), starting at new IP at RO-BG border, passing through BG using new pipeline to new IP at BG-TR border
Point
Operator
Year 2021
From Gas System To Gas System Capacity
200.0 GWh/d
Bulgartransgaz EAD
BGn
BG/EAR
Comment: Entry/Exit capacity at domestic points may go up to the level of 200GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Bulgartransgaz EAD 2021 BG/EAR BGn Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 712 GWh/d. Exit means direction RO->BG. Bulgartransgaz EAD 2021 RO/EAR BG/EAR Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BG/EAR RO/EAR Bulgartransgaz EAD 2021 BG/EAR RO/EAR
Eastring BG Domestic Point
200.0 GWh/d
342.0 GWh/d
570.0 GWh/d
Eastring Cross-Border BG/EAR <> RO/EAR
712.0 GWh/d 570.0 GWh/d 342.0 GWh/d
Bulgartransgaz EAD Bulgartransgaz EAD
2025 2021
RO/EAR BG/EAR
BG/EAR
TRe
Eastring Cross-Border BG/EAR>TR
Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border; New capacity increment from 4Q 2023 to the level of 712 GWh/d. Exit means direction BG->TR.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM