ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 47 of 620
Eastring - Bulgaria
TRA-N-654 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
31/05/2016
Project Description: Eastring-SK is subproject located in Slovakia/Ukraine and is essential part of the Eastring project, which connects IP Veľké Kapušany at the SK-UA border, with a new entry IP at an external border of the EU on the territory of Bulgaria in the following routing options: − from SK to RO − via UA, (exist. pipeline) − via HU, (new pipeline). − from RO to TR − Option A – new pipeline passing production & storage area and continuing to IP Isaccea and to BG/TR border by utilizing existing RO-BG transit assets − Option B – new pipeline, passing 2 production & storage areas and continuing to an external border of the EU on the territory of Bulgaria. The project would (i) secure supplies in case of RU disruption and therefore it will increase gas SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources for Central, Western & Southern Europe and (iii) mean step towards EU single gas market.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Variant : Eastring - BG-2
High capacity scenario, starting at new IP at RO-BG border, passing through BG using new pipeline to a new IP at BG-TR border
Point
Operator
Year 2021
From Gas System To Gas System Capacity
200.0 GWh/d
Bulgartransgaz EAD
BGn
BG/EAR
Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Bulgartransgaz EAD 2021 BG/EAR BGn Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2021 RO/EAR BG/EAR Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BG/EAR RO/EAR Bulgartransgaz EAD 2021 BG/EAR RO/EAR
Eastring BG Domestic Point
200.0 GWh/d
570.0 GWh/d
Eastring Cross-Border BG/EAR <> RO/EAR
570.0 GWh/d
570.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM