ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 30 of 620
NDP and PCI Information
Schedule
Start Date
End Date 12/2016 08/2017
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test Permitting
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2016-2025 Ten-year network development plan of BTG)
Not Applicable Not Applicable Not Relevant Not Relevant
Part of NDP
NDP Number
Section 5.5.
Exemption Granted
05/2017 11/2018 11/2018
Currently PCI
Yes (6.8.2.)
Exemption in entry direction Exemption in exit direction
Supply Contracts
0.00% 0.00%
CBCA Decision Market Survey
No
FID Construction
Not Relevant (no CBCA decision)
11/2020
Commissioning
2020
2020
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Conditional infrastructure required after the final investment decision on the realization of IBS Stage 2 related to a capacity increase of 1.8 to 3.2 bcm/y.
Gorni Bogrov - Novi Iskar
700
19
20
Lozenets-Nedyalsko
1,000
20 58 23
PF Beglej - VA Dermantsi - VA Batultsi - VA Kalugerovo
700 700
Valchi Dol - Preselka
Total
120
20
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
No
Competition, Market Integration, Security of Supply, Sustainability
The modernization, rehabilitation and expansion of the existing gas transmission infrastructure will guarantee secure and reliable natural gas transmission, enhance the efficiency, reliability and flexibility of the transmission system and provide the required capacities and pressures. The implementation of the activities planned will secure the technical capabilities for transmission of additional natural gas quantities through the territory of the country, coming in through the existing and new entry and exit points, and opportunities for diversification of the directions of transmission depending on the market interest.
Specific Criteria Fulfilled Comments
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
22
Made with FlippingBook - Online catalogs