ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 29 of 620

Rehabilitation, Modernization and Expansion of the NTS

TRA-N-298 Update Date

Project

Pipeline including CS

Non-FID

Non-Advanced

22/06/2016

A multicomponent project which consists of different actions for rehabilitation, modernization and expansion of the existing gas transmission infrastructure in Bulgaria and includes activities on: CSs modernization, inspections, repair and replacement of pipeline sections, expansion of the existing network and implementation of systems for optimization of the management process of the network technical condition. Taking into account the complex nature of the project, a 3 phases implementation is envisaged: Phase 1: Unifies the actions undertaken in the period 2013-2015, planned to be finalized in a short term and funded with BTG own resources. Phase 2: Includes actions planned to be initiated in 2016. They represent logic continuation of the overall realization of the project following the implementation of Phase 1. Phase 3: Conditional infrastructure necessary after taking the FID for stage 2 of the Interconnection Bulgaria – Serbia.

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2020

From Gas System To Gas System Capacity

19.4 GWh/d

IBS Future Operator

BGn

RS

Comment: infrastructure necessary for stage 2 of the Interconnection Bulgaria – Serbia.

Interconnector BG RS

19.4 GWh/d

IBS Future Operator

2020

RS

BGn

Comment: infrastructure necessary for stage 2 of the Interconnection Bulgaria – Serbia.

Kulata (BG) / Sidirokastron (GR) Strandzha (BG) / Malkoclar (TR)

13.8 GWh/d 58.1 GWh/d

Bulgartransgaz EAD Bulgartransgaz EAD

2020 2020

BGg/BGT BGg/BGT

GR

TRe

Sponsors Bulgartransgaz EAD

General Information

100%

Promoter Operator

Bulgartransgaz EAD Bulgartransgaz EAD

Host Country

Bulgaria Planned

Status

Website

Project's URL

Publication Approval Status

Approved

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM