Rehabilitation, Modernization and Expansion of the NTS
TRA-N-298 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
22/06/2016
A multicomponent project which consists of different actions for rehabilitation, modernization and expansion of the existing gas transmission infrastructure in Bulgaria and includes activities on: CSs modernization, inspections, repair and replacement of pipeline sections, expansion of the existing network and implementation of systems for optimization of the management process of the network technical condition. Taking into account the complex nature of the project, a 3 phases implementation is envisaged: Phase 1: Unifies the actions undertaken in the period 2013-2015, planned to be finalized in a short term and funded with BTG own resources. Phase 2: Includes actions planned to be initiated in 2016. They represent logic continuation of the overall realization of the project following the implementation of Phase 1. Phase 3: Conditional infrastructure necessary after taking the FID for stage 2 of the Interconnection Bulgaria – Serbia.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2020
From Gas System To Gas System Capacity
19.4 GWh/d
IBS Future Operator
BGn
RS
Comment: infrastructure necessary for stage 2 of the Interconnection Bulgaria – Serbia.
Interconnector BG RS
19.4 GWh/d
IBS Future Operator
2020
RS
BGn
Comment: infrastructure necessary for stage 2 of the Interconnection Bulgaria – Serbia.
Kulata (BG) / Sidirokastron (GR) Strandzha (BG) / Malkoclar (TR)
13.8 GWh/d 58.1 GWh/d
Bulgartransgaz EAD Bulgartransgaz EAD
2020 2020
BGg/BGT BGg/BGT
GR
TRe
Sponsors Bulgartransgaz EAD
General Information
100%
Promoter Operator
Bulgartransgaz EAD Bulgartransgaz EAD
Host Country
Bulgaria Planned
Status
Website
Project's URL
Publication Approval Status
Approved