ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 387 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Snam Rete Gas TYNDP 2016-2025)
Regulated Regulated
NA
No
Currently PCI
Exemption Granted
No
Not Relevant
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2019
2019
Technical Information (UGS)
Storage Facility
Bordolano
Storage Facility Type
Depleted Field
Multiple-Cycle
No
Working Volume (mcm)
757.00
the entire w.g. volume of Bordolano (first + second phases) is 1.136 M Nmc
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Increased flexibility of the system; Market integration (increase of competition and market liquidity).
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
200