ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 353 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Snam Rete Gas TYNDP 2016-2025)
Regulated Regulated
TRA-N-008(into text)
No No
Currently PCI
Exemption Granted
No
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2034
2034
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Section 1 Section 2 Section 3
1,050 1,400
15
0 0
119
0
0
75 75
Total
134
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Security of Supply, Market integration, Diversification of sources, Diversification of routes, N-1 National (Italy), Back-up for renewables, Power-to-gas, Market Integration (Increase of competition), Flexibility of the system.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
196