ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 379 of 620
Interconnection with Slovenia
TRA-N-354 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
24/05/2016
In line with the expected increase in gas consumption in the area of Koper (SLO), the project foresees new capacity at the new exit point of the national network of San Dorligo della Valle.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point San Dorligo della Valle (IT) /Osp (SI)
Operator
Year 2023
From Gas System To Gas System Capacity
3.6 GWh/d
Snam Rete Gas S.p.A.
IT
SI
Sponsors Snam Rete Gas s.p.a.
General Information
100%
Promoter Operator
Snam Rete Gas S.p.A. Snam Rete Gas S.p.A.
Host Country
Italy
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Snam Rete Gas TYNDP 2016-2025)
Regulated Regulated
TRA-N-354
No No
Currently PCI
Exemption Granted
No
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2023
2023
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
193
Made with FlippingBook - Online catalogs