ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 351 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Snam Rete Gas TYNDP 2016-2025)
Regulated Regulated
TRA-N-007(into text)
No No
Currently PCI
Exemption Granted
Yes (6.18)
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2023
2023
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
All the pipe
1,200
430 430
33 33
Total
PCI Details
PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply Specific Criteria Fulfilled Comments The project fulfills also the criteria of diversification of sources, diversification of routes, N-1 National (Italy), back-up for renewables, power-to- gas, market Integration (Increase of competition) and flexibility of the system.
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Security of supply, diversification of sources, diversification of routes, N-1 National (Italy), back-up for renewables, power-to-gas, market Integration (Increase of competition) and flexibility of the system.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
192
Made with FlippingBook - Online catalogs