ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 364 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Snam Rete Gas TYNDP 2016-2025)
Regulated Regulated
TRA-F-214(into text)
No No
Currently PCI
Exemption Granted
Yes (5.11)
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2018
2018
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Section 1 Section 2 Section 3
1,400 1,200
62 19
0 0
0
0
85 85
Total
81
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply Specific Criteria Fulfilled Comments The project fulfills also the criteria of reverse flows, diversification of routes, N-1 regional, back-up for renewables, power-to-gas, market integration (increase of competition), flexibility of the system and reduction of GHG emissions.
Benefits
Main Driver
Market Demand
Main Driver Explanation
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
189
Made with FlippingBook - Online catalogs