ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 336 of 620
Development of Transmission Capacity at Slovak-Hungarian interconnector
TRA-N-636 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
25/05/2016
Reducing the flow direction switch operation time. Developing the transmission capacity in HU>SK and SK>HU direction from interruptible capacity to non-interruptible (firm) capacity.
Description
Regulatory Decisions and similar material conditions
Sponsors
General Information
Promoter
Magyar Gáz Tranzit Zrt.
MGT Hungarian Gas Transit Ltd.
Operator
Host Country
Hungary Planned
Status
Website Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-F-148 Slovak-Hungarian interconnector (Vecsés-Szada-Balassagyarmat) TRA-N-524 Enhancement of Transmission Capacity of Slovak-Hungarian interconnector
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM