Enhancement of Transmission Capacity of Slovak-Hungarian interconnector

TRA-N-524 Update Date

Project

Pipeline including CS

Non-FID

Non-Advanced

25/05/2016

Enhancement of Exit transmission capacity with 102 GWh/day in HU>SK direction and enhancement of Entry transmission capacity with 26 GWh/day in SK>HU direction at Balassagyarmat with new compressors on Szada Compressor station. The available bi-directional transmission capacities will be the same in both direction at the Slovak-Hungarian interconnector.

Description

Regulatory Decisions and similar material conditions

Capacity Increments Variant For Modelling Point

Operator

Year 2017 2017 2017

From Gas System To Gas System Capacity

102.0 GWh/d 26.0 GWh/d 102.0 GWh/d

MGT Hungarian Gas Transit Ltd. MGT Hungarian Gas Transit Ltd. MGT Hungarian Gas Transit Ltd.

HUi

SK

Balassagyarmat (HU) / Velké Zlievce (SK)

SK

HUi HUi

HU

Vecsés MGT / FGSZ

Comment: .

26.0 GWh/d

MGT Hungarian Gas Transit Ltd.

2017

HUi

HU

Sponsors

General Information

Promoter

Magyar Gáz Tranzit Zrt.

MGT Hungarian Gas Transit Ltd.

Operator

Host Country

Hungary Planned

Status

Website Publication Approval Status

Approved

Enabled Projects

Project Code Project Name TRA-F-148 Slovak-Hungarian interconnector (Vecsés-Szada-Balassagyarmat) TRA-N-636 Development of Transmission Capacity at Slovak-Hungarian interconnector

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM