Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

hajdúszoboszló CS Hajduszoboszlo node

6 0 6

No cross-border (interconnection point) relevance.

Total

Time Schedule

Grant Obtention Date Delay Since Last TYNDP

Yes, 1 year.

Delay Explanation

Due to decreasing transmission volume the project was rescheduled.

Benefits

Main Driver

Others

Main Driver Explanation

o The Hungarian projects taken as a whole main aim, is to enhance the flexibility of the Hungarian transmission system by connecting to neighbouring systems, ensuring reserves flow availability, and guaranteeing flow deliverability which will enhance the transmission systems security of supply position along with helping with further market integration. In particular, this project helps the reverse flow from Varösföld to Beregdaroc.

Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM