ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 323 of 620
NDP and PCI Information
Schedule
Start Date
End Date 06/2014 07/2017 04/2020 12/2016 09/2018 04/2017 10/2018 12/2022
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Hungarian TYNDP 2015)
Regulated Regulated
Feasibility
12.6.1.
09/2016 11/2018
FEED
No No
Currently PCI
Market Test Permitting
Exemption Granted
Yes (6.24.9.)
05/2017
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
Supply Contracts
Yes (2016-10-06)
0.00% 0.00%
Open Season(2016-12-31)
FID
Construction
03/2021
Commissioning
2022
2022
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Csanádpalota
+1 Comressor unit 4.5MW
4 4
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP
14/10/2015
3 year
Delay Explanation
Black Sea project delay
Expected Gas Sourcing
Black Sea
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
171
Made with FlippingBook - Online catalogs