ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 24 of 620

Interconnection Turkey-Bulgaria

TRA-N-140 Update Date

Project

Pipeline including CS

Non-FID

Non-Advanced

29/06/2016

Construction of new onshore gas pipeline in the section between the village of Losenets and the Bulgarian-Turkish border in the region of the village of Strandja in parallel to the existing transit gas pipeline of about 76 km length on Bulgarian territory, diameter of the pipe 700 mm and capacity of about 3 bcm/y at operating pressure 64 bar. A compressor station Losenets – 2 near the existing compressor station in the region of the village of Losenets is also envisaged to be built. The project, as part of the priority Southern Gas Corridor is crucial in terms of security and diversification of the sources and routes of natural gas supply to/through Bulgaria and the region. Its implementation is directly related to achievement of the conditions required for creation of a competitive gas market, increase of systems' flexibility and market integration.

Description

Sponsors Bulgartransgaz EAD for the gas pipeline section on the territory of Bulgaria Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point Interconnector ITB (Turkey - Bulgaria) (BG>TR) Interconnector ITB (Turkey - Bulgaria) (TR>BG)

Operator

Year 2020 2020

From Gas System To Gas System Capacity

97.0 GWh/d 97.0 GWh/d

Bulgartransgaz EAD Bulgartransgaz EAD

BGn

BG/ITB

BG/ITB

BGn

General Information

Promoter Operator

Bulgartransgaz EAD Bulgartransgaz EAD

100%

Host Country

Bulgaria Planned

Status

Website

Project's URL

Publication Approval Status

Approved

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B | 18

Made with FlippingBook - Online catalogs