ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 313 of 620
Városföld CS
TRA-N-123 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
06/05/2016
An additional compressor unit (5.7 MW) at the existing compressor station at Városföld, necessary to ensure adequate pressure for the transportation along the HU section of the Corridor.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator FGSZ Ltd.
Year 2022
From Gas System To Gas System Capacity
Mosonmagyarovar
25.0 GWh/d
AT
HU
Sponsors FGSZ Ltd.
General Information
100%
Promoter Operator
FGSZ Ltd. FGSZ Ltd. Hungary Planned
Host Country
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-018 Városföld-Ercsi-Győr TRA-N-286 Romanian-Hungarian reverse flow Hungarian section 1st stage
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
167
Made with FlippingBook - Online catalogs