ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 309 of 620

NDP and PCI Information

Schedule

Start Date

End Date 06/2014 07/2017 04/2020 12/2016 09/2018 04/2017 10/2018 12/2022

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (Hungarian TYNDP 2015)

Regulated Regulated

Feasibility

12.9.

09/2016 11/2018

FEED

No No

Currently PCI

Market Test Permitting

Exemption Granted

Yes (6.24.5)

05/2017

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

Supply Contracts

Yes (2016-12-31)

0.00% 0.00%

Open Season(2016-12-31)

FID

Construction

03/2021

Commissioning

2022

2022

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Ercsi-Szazhalombatta

800

11

Total

11

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Security of Supply

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date Delay Since Last TYNDP

14/10/2015

3 year

Delay Explanation

New power plants' demands delay minimum 3 year, which related to the TYNDP.

Expected Gas Sourcing

which available from Slovakia direction

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

165

Made with FlippingBook - Online catalogs