ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 308 of 620

Ercsi-Szazhalombatta

TRA-N-061 Update Date

Project

Pipeline including CS

Non-FID

Non-Advanced

06/05/2016

New pipeline between Ercsi and Szazhalombatta nodes, DN800 PN63, 11 km. The 11 km long pipeline connecting the Városföld-Ercsi-Győr pipeline at Ercsi to the Budapest ring at Százhalombatta (Central Hungary) – it increases the capacity of the HU-SK interconnector up to 152 GWh/d; 600 000 m3/h (at 15 °C) in both directions in the FGSZ system.

Description

Regulatory Decisions and similar material conditions

Capacity Increments Variant For Modelling Point

Operator FGSZ Ltd.

Year 2022

From Gas System To Gas System Capacity

Vecsés MGT / FGSZ

25.5 GWh/d

HUi

HU

Sponsors FGSZ Ltd.

General Information

100%

Promoter Operator

FGSZ Ltd. FGSZ Ltd. Hungary Planned

Host Country

Status

Website Publication Approval Status

Approved

Enabled Projects

Project Code Project Name TRA-N-123 Városföld CS TRA-N-018 Városföld-Ercsi-Győr

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

164

Made with FlippingBook - Online catalogs