ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 37 of 620

Benefits

Main Driver Others Main Driver Explanation Market integration; Security of supply, Competiotion.

The project is part of the concept for coordinated development of the gas transmission networks of Bulgaria, Romania and Hungary (transmission corridor Bulgaria-Romania-Hungary-Austria) designed for a bi-direction natural gas transport. The realization of the Bulgarian section together with the existing gas transmission system is expected to secure the technical possibility for natural gas supplies between 3-5 bcm/y between the planned entry points on the Bulgarian southern border and Romania and Hungary providing an opportunity to access the Central European Gas market. The project wil enhance market integration and competition and gurantee the SoS at regional level.

Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B | 17

Made with FlippingBook - Online catalogs