ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 339 of 620
Eastring - Hungary
TRA-N-656 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
27/05/2016
Eastring-HU is subproject located in Hungary and is essential part of the Eastring project, which connects IP Veľké Kapušany at the SK-UA border, with IP at the BG/TR border in the following routing options: − from SK to RO − via HU, (new pipeline). − from RO to TR − Option A – new pipeline passing production & storage area and continuing to IP Isaccea and then to BG/TR border by utilizing existing RO-BG transit assets − Option B – new pipeline, passing 2 production & storage areas and continuing to BG/TR border. The project would (i) secure supplies in case of RU disruption and therefore it will increase gas SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources for Central, Western & Southern Europe and (iii) mean step towards EU single gas market.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator FGSZ Ltd. FGSZ Ltd. FGSZ Ltd. FGSZ Ltd. FGSZ Ltd.
Year 2021 2021 2025 2025 2021
From Gas System To Gas System Capacity
570.0 GWh/d 570.0 GWh/d 570.0 GWh/d 570.0 GWh/d 570.0 GWh/d
HU/EAR SK/EAR HU/EAR SK/EAR HU/EAR
SK/EAR HU/EAR SK/EAR HU/EAR RO/EAR
Eastring Cross-Border HU/EAR <> SK/EAR
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. FGSZ Ltd. 2021 RO/EAR HU/EAR Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. FGSZ Ltd. 2025 HU/EAR RO/EAR
570.0 GWh/d
Eastring Cross-Border RO/EAR <> HU/EAR
570.0 GWh/d 570.0 GWh/d 570.0 GWh/d 570.0 GWh/d
FGSZ Ltd. FGSZ Ltd. FGSZ Ltd.
2025 2021 2021
RO/EAR
HU/EAR HU/EAR
HU
Eastring HU Domestic Point
HU/EAR
HU
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM