Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Piping installation at Városföld, Hajdúszoboszló, Beregdaróc nodes and compressor stations and aftercoolers, which enables the reverse flow. Measuring station is also necessary at Beregdaróc node.
Hungarian section
0
Total
0
Expected Gas Sourcing
Algeria, Norway, Russia, LNG (HR)
Benefits
Main Driver Market Demand Main Driver Explanation At the moment FGSZ is able to ensure only interruptible capacity at IP Beregdaróc (HU>UA direction). Ukrainian party always requests firm capacity, and this new entry point is very important for Ukraine. Benefit Description Barriers Barrier Type Description Others Financing difficulties.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM