ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 331 of 620
Hungarian section of Tesla project
TRA-N-585 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
27/05/2016
The main aim of the Tesla project is to transport natural gas from the planned Turkish Stream (RU-TR) to Central and Eastern Europe via Greece, Macedonia, Serbia, Hungary and Austria. The Hungarian section is part of the TR-GR-FYROM-SRB-HU-AT corridor. The main flow direction is from Turkey to Austria, but accoridng to EU rules we intend to ensure the reverse flow (from Austria to Turkey) with the same capacity as the main flow direction.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator FGSZ Ltd. FGSZ Ltd.
Year 2020 2020
From Gas System To Gas System Capacity
TESLA / HU Offtake
175.0 GWh/d 582.0 GWh/d
HU/TLA RS/TLA
HU
TESLA / RS>HU
HU/TLA
Sponsors FGSZ Ltd.
General Information
100%
Promoter Operator
FGSZ Ltd. FGSZ Ltd. Hungary Planned
Host Country
Status
Website Publication Approval Status
Approved
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
153
Made with FlippingBook - Online catalogs