ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 320 of 620

NDP and PCI Information

Schedule

Start Date

End Date 12/2015 12/2017 11/2019

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (Hungarien TYNDP 2015)

Regulated Regulated

Feasibility

12.12.1.-12.12.2

05/2016 06/2017

FEED

No No

Currently PCI

Market Test Permitting

Exemption Granted

Yes (6.23)

11/2016

10/2017

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

Supply Contracts FID

No

0.00% 0.00%

Not Relevant (no CBCA decision)

02/2018 12/2020

Construction

09/2019

Commissioning

2020

2020

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Nagykanizsa-Tornyiszentmiklós

500

41 41

9 9

Total

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Market Integration, Security of Supply

Specific Criteria Fulfilled Comments

Expected Gas Sourcing

LNG ()

Benefits

Main Driver

Market Demand

Main Driver Explanation

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

151