ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 35 of 620

A project for the construction of a gas pipeline BG-RO

TRA-N-379 Update Date

Project

Pipeline including CS

Non-FID

Non-Advanced

22/06/2016

The project is part of the concept for coordinated development of gas transmission networks of Bulgaria, Romania and Hungary (transport corridor Bulgaria-Romania-Hungary-Austria), designed for the bi-lateral natural gas transport between the countries. The project on the territory of Bulgaria includes the construction of a new infrastructure and modernization and expansion of the existing network in order to increase the capacity of interconnectivity of the northern semi-ring of the national gas transmission network of Bulgartransgaz EAD and the gas transmission network of Transgaz S.А., Romania. The implementation of the Bulgarian section together with the existing gas transmission infrastructure is expected to ensure the technical possibilities for supply of natural gas between 3 - 5 bcm/y between the planned entry points on Bulgaria’s southern border and between Romania and Hungary, with an opportunity for access to the Central European gas market.

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2018 2018

From Gas System To Gas System Capacity

85.0 GWh/d 85.0 GWh/d

Bulgartransgaz EAD Bulgartransgaz EAD

BGn

RO

New IP Bulgaria (BG) / Romania (RO) (3)

RO

BGn

Sponsors Bulgartransgaz EAD

General Information

100%

Promoter Operator

Bulgartransgaz EAD Bulgartransgaz EAD

Host Country

Bulgaria Planned

Status

Website

Project's URL

Publication Approval Status

Approved

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM