ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 237 of 620
Sponsors EastMed pipeline: from Crete to Peloponnese IGI Poseidon SA EastMed pipeline: from Cyprus to Crete IGI Poseidon SA EastMed pipeline: from Levantine Basin to Cyprus IGI Poseidon SA 100% EastMed pipeline: from Peloponnese to West Greece IGI Poseidon SA 100% EastMed pipeline: from West Greece to Thesprotia (tie-in 100% 100%
General Information
Natural Gas Submarine Interconnector Greece-Italy Poseidon S.A
Promoter
Operator
IGI Poseidon S.A.
Host Country
Greece
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
with Poseidon) IGI Poseidon SA
100%
NDP and PCI Information
Schedule
Start Date
End Date 08/2012 04/2016 06/2017 07/2017 12/2017 12/2017 06/2017 12/2020
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (EastMed pipeline is not included in the Greek NDP, as the project is considered an Indipendent Natural gas System. In Cyprus there is no NND as the country does not have any gas TSO.)
Not Applicable Not Applicable
Feasibility
05/2015 09/2016
Part of NDP
FEED
Not Yet
Market Test Permitting
Exemption Granted
No
06/2016
NDP Number
Exemption in entry direction Exemption in exit direction
Supply Contracts
0.00% 0.00%
FID
Currently PCI
Yes (7.3.1)
Construction
01/2018
Commissioning
2020
2020
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM