EastMed Pipeline
TRA-N-330 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
25/05/2016
The EastMed project is an approximately 1900 km offshore/onshore pipeline project that will directly connect the East Mediterranean gas resources to the European gas system. The project consists of 5 sections connecting the following areas: Levantine basin – Cyprus –Crete- Peloponnese –West Greece-Thesprotia. The system will have a capacity of 320-350 GWh/d with the option to upgrade the capacity of the pipeline sections from Crete up to 510 Gwh/d, in case relevant reserves will be discovered in the offshore of Crete.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2020
From Gas System To Gas System Capacity
190.0 GWh/d
IGI Poseidon S.A.
GRc
GR/EMD
Comment: In case relevant gas reserves will be discoveredin the offshore area around Crete island. IGI Poseidon S.A. 2020 GR/EMD GRc
East Med / Crete (GR)
20.0 GWh/d 30.0 GWh/d 350.0 GWh/d 90.0 GWh/d 320.0 GWh/d
East Med / Cyprus (CY)
IGI Poseidon S.A. IGI Poseidon S.A. IGI Poseidon S.A. IGI Poseidon S.A.
2020 2020 2020 2020
GR/EMD
CY
East Med / Cyprus/Israeli Production Field
NPcCY
GR/EMD
East Med / Peloponnesus (GR)
GR/EMD
GR
GR/IGI
GR/EMD
East Med / Thesprotia (Poseidon)
Comment: It could be upgraded for further 190 Gwh/d, in case relevant gas reserves will be discoveredin the offshore area around Crete