ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 213 of 620

NDP and PCI Information

Schedule

Start Date

End Date 06/2003 10/2007 04/2013 06/2017 12/2016 12/2017 06/2017 07/2020

Third-Party Access Regime

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

No (Poseidon pipeline is mentioned in the latest Italian NDP in ANNEX 4 (page 76) while in the Greek NDP there is no reference to the project, since it constitutes an Independent Natural Gas System (INGS). )

Not Applicable Not Applicable

Feasibility

03/2004 04/2010

FEED

Yes Yes

Part of NDP

Market Test Permitting

Exemption Granted

11/2006

Exemption in entry direction Exemption in exit direction

Supply Contracts

0.00%

NDP Number

FID

89.00%

Construction

12/2017

Currently PCI

Yes (7.1.4)

Commissioning

2020

2020

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

In 2015 technical studies have been finalized for the potential upgrade of capacity up to 20 Bcm/yr in order to allow the transportation of gas from sources available at the Greek borders and from the sources recently discovered in East Med region.

Poseidon pipeline

808

216

120

Total

216

120

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability