Poseidon Pipeline
TRA-N-010 Update Date
Project
Pipeline including CS
Non-FID Advanced
25/05/2016
The Poseidon project consists of a multisource offshore pipeline that will connect the Greek and Italian natural gas transportation systems. The Poseidon project is designed to import 14 Billion cubic meters per year of natural gas from sources available at the Greek borders, such as Caspian, East Mediterranean, Middle East. The total capacity could be upgraded up to 20 Bcm/y with minimal modification of the basic configuration, mainly regarding increased power of the compression station. Decree of the Italian Ministry for Economic Development, dated 31.01.2007 (amended by the Decree dated 21.06.2007) granting exemption from Third Party Access to IGI Poseidon S.A.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator
Year 2020 2020 2020 2020 2020
From Gas System To Gas System Capacity
East Med / Thesprotia (Poseidon)
320.0 GWh/d 252.5 GWh/d 329.4 GWh/d 329.4 GWh/d 252.5 GWh/d
IGI Poseidon S.A. IGI Poseidon S.A. IGI Poseidon S.A. IGI Poseidon S.A. IGI Poseidon S.A.
GR/EMD
GR/IGI GR/IGI IB-ITs GR/IGI IB-GRk
IB-ITs GR/IGI IB-GRk GR/IGI
Otranto - IT / IGI Poseidon
Poseidon Greek Entry
Sponsors IGI POSEIDON S.A.
General Information
100%
Natural Gas Submarine Interconnector Greece-Italy Poseidon S.A
Promoter
Operator
IGI Poseidon S.A.
Host Country
Greece
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-330 EastMed Pipeline