ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 228 of 620
NDP and PCI Information
Schedule
Start Date
End Date 12/2010 06/2014 12/2016 03/2017 01/2015
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator.)
Regulated Regulated
Feasibility
01/2014 05/2016
Part of NDP
FEED
No
Market Test Permitting
Exemption Granted
Not Relevant
12/2010
NDP Number
Exemption in entry direction Exemption in exit direction
Supply Contracts FID
0.00% 0.00%
12/2016 06/2018
Currently PCI
Yes (6.9.1 )
Construction
04/2017
Commissioning
2018
2018
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Alexandroupolis LNG terminal - M/R Amfitriti
762
28 28
0 0
Total
PCI Details
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at supplying directly or indirectly at least two Member States
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Market Integration - Regional (SEE + Serbia + FYROM) and beyond (e.g. Hungary and through across the NSI gas corridor) Security of Supply through inter alia source and route diversification- Greece, Bulgaria, Serbia, FYROM, Hungary, Ukraine, Turkey Enhances competition in the region by introducing new sources and routes of supply Sustainability - Supports back up to renewables and power to gas
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP
16/04/2015
12 months in commissining date / same delay in FID
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
132
Made with FlippingBook - Online catalogs