LNG terminal in northern Greece / Alexandroupolis - Pipeline Section

TRA-N-063 Update Date

Project

Pipeline including CS

Non-FID Advanced

20/05/2016

Please note that this part refers only to the pipeline section of the Project. The LNG section of the Project is addressed in LNG-N-062. The project consists of an LNG offshore Floating Storage Regasification Unit, a Mooring & a Pipeline system (24km Subsea and 4km Onshore), connecting the floating unit to the Greek National Natural Gas System at the area of Amfitriti, 5.5km NE of Alexandroupolis where, DESFA, the NNGS TSO, will build a metering & regulating station. The regasified LNG will be transmissioned from the floating unit to the 30'' subsea and onshore pipeline through a Pipeline End Manifold. A valve station will be established to the shore-crossing point of the pipeline. The maximum capacity of the pipeline is 6.1 bcm/y. No TPA exemption requested NRA only gave opinion on the Independent Natural Gas System License issued by the Ministry of Energy & Environment on 19.08.2011 (opin. number 29/2011)

Description

Regulatory Decisions and similar material conditions

Capacity Increments Variant For Modelling Point

Operator

Year 2018

From Gas System To Gas System Capacity

187.5 GWh/d

Gastrade S.A.

LNG_Tk_GR

GRa

Alexandropoulis LNG

Comment: Increment not assessed by ENTSOG: Submitted in the linked Pipelines project

268.0 GWh/d

Gastrade S.A.

2018

GRa

IB-GRk

Alexandroupolis Amphitriti

Comment: Increment not assessed by ENTSOG: Submitted in the linked LNG project

Sponsors LNG-N-062 GASTRADE S.A. TRA-N-063 GASTRADE S.A.

General Information

Promoter Operator

Gastrade S.A. Gastrade S.A.

100%

Host Country

Greece

Status

Planned

100%

Website

Project's URL

Publication Approval Status

Approved

Enabled Projects

Project Code Project Name LNG-N-062 LNG terminal in northern Greece / Alexandroupolis - LNG Section

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

131

Made with FlippingBook - Online catalogs