ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 224 of 620

NDP and PCI Information

Schedule

Start Date

End Date 12/2010 06/2014 12/2016 03/2017 01/2015

Third-Party Access Regime

Pre-Feasibility

Considered TPA Regime Considered Tariff Regime Applied for Exemption

No (The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. )

Regulated Regulated

Feasibility

01/2014 05/2016

FEED

No

Part of NDP

Market Test Permitting

Exemption Granted

Not Relevant

12/2010

Exemption in entry direction Exemption in exit direction

Supply Contracts FID

0.00% 0.00%

NDP Number

12/2016 06/2018

Construction

04/2017

Currently PCI

Yes (6.9.1)

Commissioning

2018

2018

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

Technical Information (LNG)

LNG terminal in northern Greece / Alexandroupolis

LNG Facility

Expected Volume (bcm/y) Storage Capacity (m3)

6

New regaseification technical capacity increment will be available from start of operations.

170,000 170,000

4 storage tanks

Ship Size (m3)

DWT 85,000 MT, LOA 300-310 m., Breadth 46 m., Draft 12m.

Reloading Ability

Yes

PCI Details

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at supplying directly or indirectly at least two Member States

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Market Integration - Regional (SEE + Serbia + FYROM) and beyond (e.g. Hungary and through across the NSI gas corridor) Security of Supply through inter alia source and route diversification- Greece, Bulgaria, Serbia, FYROM, Hungary, Ukraine, Turkey Enhances competition in the region by introducing new sources and routes of supply Sustainability - Supports back up to renewables and power to gas

Specific Criteria Fulfilled Comments

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

128