ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 221 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (The TAP project is being developed on a stand-alone basis, independent from the national transmission systems of Greece, Albania and Italy.)
Negotiated Negotiated
Part of NDP
01/2008
03/2013 11/2014 03/2017 09/2013 12/2013 12/2019
Yes Yes
Exemption Granted
NDP Number
Permitting
09/2011
Exemption in entry direction Exemption in exit direction
Supply Contracts
100.00% 100.00%
Currently PCI
Yes (7.1.3)
FID
Construction
05/2016
CBCA Decision Market Survey
No
Commissioning
2019
2019
Not Relevant (no CBCA decision)
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Main onshore section
48" onshore section Greece and Albania
1,200
773 105 878
90 90
Offshore section
36" offshore sectoin and short onshore section Italy
900
Total
180
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply
Specific Criteria Fulfilled Comments
Expected Gas Sourcing
Caspian Region
Comments about the Third-Party Access Regime Initial Capacity exempted from third party access. Expansion Capacity is subject to third party access and will be offered to the market via market tests, fromm no later than start of operations and subsequently every two years.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
125
Made with FlippingBook - Online catalogs