Trans Adriatic Pipeline

TRA-F-051 Update Date

Project

Pipeline including CS

FID

Advanced

24/05/2016

The Trans Adriatic Pipeline (TAP) will transport natural gas from Kipoi in Greece near the Greek/Turkish border, via Albania and across the Adriatic Sea, to Italy’s southern Puglia region in Province of Lecce. In its upstream part, TAP will interconnect with TANAP which is linked further to the east with systems in Turkey, to secure access to the Shah Deniz natural gas field in Azerbaijan and tie into Italy’s gas transportation grid operated by Snam Rete Gas in the province of Lecce. TAP's capacity can be expanded up to a total of 20 bcm/a, subject to binding market demand. The Expansion Capacity will be offered to the market via market tests, from no later than start of operations and subsequently every two years.

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2019

From Gas System To Gas System Capacity

25.0 GWh/d

Trans-Adriatic Pipeline AG

GR/TAP

MK

Comment: Point not in TAP's initial design.

Gostivar (MK) / TAP

GCV used for capacity calculations: 11.071 kWh/Sm3.

Incremental capacity available for allocation is subject to a check of the system's capabilities and dependent on the capacity bookings in place.

150.0 GWh/d

Trans-Adriatic Pipeline AG

2019

GR/TAP

IB-HRi/IAP

Comment: Point not in TAP's initial design.

Ionic-Adriatic Pipeline - IAP Entry

GCV used for capacity calculations: 11.071 kWh/Sm3.

Incremental capacity available for allocation is subject to a check of the system's capabilities and dependent on the capacity bookings in place.

350.0 GWh/d

Trans-Adriatic Pipeline AG

2019

TR/TNP

GR/TAP

Kipi (TR) / Kipi (TAP)

Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.

142.0 GWh/d

Trans-Adriatic Pipeline AG

2019

GR/TAP

BG/IGB

Komotini - TAP / IGB

Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.

Melendugno - IT / TAP

334.0 GWh/d

Trans-Adriatic Pipeline AG

2019

GR/TAP

IB-ITs