Trans Adriatic Pipeline
TRA-F-051 Update Date
Project
Pipeline including CS
FID
Advanced
24/05/2016
The Trans Adriatic Pipeline (TAP) will transport natural gas from Kipoi in Greece near the Greek/Turkish border, via Albania and across the Adriatic Sea, to Italy’s southern Puglia region in Province of Lecce. In its upstream part, TAP will interconnect with TANAP which is linked further to the east with systems in Turkey, to secure access to the Shah Deniz natural gas field in Azerbaijan and tie into Italy’s gas transportation grid operated by Snam Rete Gas in the province of Lecce. TAP's capacity can be expanded up to a total of 20 bcm/a, subject to binding market demand. The Expansion Capacity will be offered to the market via market tests, from no later than start of operations and subsequently every two years.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2019
From Gas System To Gas System Capacity
25.0 GWh/d
Trans-Adriatic Pipeline AG
GR/TAP
MK
Comment: Point not in TAP's initial design.
Gostivar (MK) / TAP
GCV used for capacity calculations: 11.071 kWh/Sm3.
Incremental capacity available for allocation is subject to a check of the system's capabilities and dependent on the capacity bookings in place.
150.0 GWh/d
Trans-Adriatic Pipeline AG
2019
GR/TAP
IB-HRi/IAP
Comment: Point not in TAP's initial design.
Ionic-Adriatic Pipeline - IAP Entry
GCV used for capacity calculations: 11.071 kWh/Sm3.
Incremental capacity available for allocation is subject to a check of the system's capabilities and dependent on the capacity bookings in place.
350.0 GWh/d
Trans-Adriatic Pipeline AG
2019
TR/TNP
GR/TAP
Kipi (TR) / Kipi (TAP)
Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.
142.0 GWh/d
Trans-Adriatic Pipeline AG
2019
GR/TAP
BG/IGB
Komotini - TAP / IGB
Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.
Melendugno - IT / TAP
334.0 GWh/d
Trans-Adriatic Pipeline AG
2019
GR/TAP
IB-ITs