TAG Reverse Flow

TRA-N-954 Update Date

Project

Pipeline including CS

Non-FID

Non-Advanced

25/05/2016

The objective of the planning project “TAG Reverse Flow“ is to create a reverse flow on the TAG GmbH pipeline system with three project variations: 1a Reverse Flow by upgrading existing entry DZK capacity to entry FZK capacity at the IP Arnoldstein/Tarvisio and additionally by allowing potential entry FZK capacity at the IP Ceršak/Murfeld. Physical interconnection capacity via an exit from the TAG GmbH pipeline system to the Gas Connect Austria GmbH subsystem PVS-AZ1. 1b Reverse Flow by upgrading existing entry DZK capacity to entry FZK capacity at the IP Arnoldstein/Tarvisio. Physical interconnection between the TAG pipeline system to the Gas Connect Austria subsystem PVS-AZ1. Further, the project shall also enable a physical connection at the IP Baumgarten at the Austrian/Slovakian boarder by upgrading existing backhaul capacity “Exit Baumgarten” to FZK capacity “Exit Baumgarten” of TAG GmbH. 1c This variation of the project is a combination of project variation 1a and 1b.

Description

Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point

Operator

Year 2018

From Gas System To Gas System Capacity

268.6 GWh/d

TAG GmbH

AT

SK

Comment: The project enable a physical connection at the IP Baumgarten (TAG GmbH/eustream a.s.) at the Austrian/Slovakian boarder by upgrading existing backhaul capacity “Exit Baumgarten” to FZK capacity “Exit Baumgarten” of TAG GmbH

Baumgarten

0.0 GWh/d

TAG GmbH

2018

IB-ITe

AT

Comment: Reverse Flow by upgrading existing entry DZK capacity to entry FZK capacity at the IP Arnoldstein/Tarvisio and additionally by allowing potential entry FZK capacity at the IP Ceršak/Murfeld.

Tarvisio (IT) / Arnoldstein (AT)

Sponsors Trans Austria Gasleitung GmbH

General Information

100%

Trans Austria Gasleitung GmbH

Promoter

Operator

TAG GmbH

Host Country

Austria Planned

Status

Website Publication Approval Status

Approved