ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 253 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
No (The Project is included in the 10-year Development Study. The D. S. includes projects which are likely to be implemented but are not yet part of the compulsory Projects.)
Regulated Regulated
Part of NDP
Yes Yes
Exemption Granted
NDP Number
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
Currently PCI
No
2020
2020
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Nea-Messimvria to Pontoiraklia/Stojakovo
700
50 50
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply
Specific Criteria Fulfilled Comments
Expected Gas Sourcing
Caspian Region, LNG (DZ,WO)
Benefits
Main Driver
Market Demand
Main Driver Explanation
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
108
Made with FlippingBook - Online catalogs