ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 244 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Regulated Regulated
No
No (The project is still on the maturing phase and will be included in the NDP in a later stage.)
Part of NDP
Exemption Granted
Not Relevant
Exemption in entry direction Exemption in exit direction
0.00% 0.00%
Greek TS to TAP.)
NDP Number
2020
2020
Currently PCI
Yes (6.25.2)
CBCA Decision Market Survey
No
Not Relevant (no CBCA decision)
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Greek section
1,400
370 370
280 280
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Market Integration, Security of Supply, Sustainability
MI. The project will provide access to natural gas to countries/ regions without adequate access to it SoS. The project will provide a diversified supply route Sustainability. The project will increase gas penetration in countries/regions where it will replace less environment friendly energy sources
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
101
Made with FlippingBook - Online catalogs