Pipelines and Compressor Stations - Alternative Variant

case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and IGB will be supplied by the DESFA network therefore the C/S will supply gas to the DESFA system and the ones of neighbouring operators through IGB.

206.40 GWh/d

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Kipi

0

0 0

18 18

Total

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date Delay Since Last TYNDP

0

Delay Explanation

Expected Gas Sourcing Caspian Region, Russia, LNG (), Other Central Asian, Middle Eastern and East-Mediterranean sources

Benefits

Main Driver

Market Demand

Main Driver Explanation Benefit Description

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM