ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 232 of 620
Sponsors DESFA S.A.
General Information
100%
Promoter Operator
DESFA S.A. DESFA S.A.
Host Country
Greece
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Development Plan NNGS 2015-2024)
Regulated Regulated
2.2.1.3
No
Currently PCI
Exemption Granted
Yes (6.9.3 and 7.4.1)
Not Relevant
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2020
2020
Pipelines and Compressor Stations
case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and IGB will be supplied by TAP therefore the C/S will supply gas to the DESFA system and the ones of neighbouring operators.
103.20 GWh/d
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Kipi
0
0 0
9 9
Total
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
98