Compressor Station Kipi
TRA-N-128 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
04/07/2016
The project consists of a Compressor Station on the GR side of the GR/TK border aiming at increasing the capacity of the Greek transmission system in order to make possible the transmission of natural gas to the Greek and European markets with the use of downstream transmission systems. Depending on the variant that will be implemented the configuration will be (1+1) x 4.5 MW or( 1+1) x 9.7 MW or (2+1) x 9.7 MW.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling
case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and IGB will be supplied by TAP therefore the C/S will supply gas to the DESFA system and the ones of neighbouring operators.
Variant : 103.20 GWh/d
Point
Operator DESFA S.A.
Year 2020
From Gas System To Gas System Capacity
54.4 GWh/d
TRi
IB-GRk
Kipi (TR) / Kipi (GR)
Comment: 3 bcm/y
54.4 GWh/d
DESFA S.A.
2020
IB-GRk
GR
Komotini (DESFA) Bottleneck
Comment: 3 bcm/y
Capacity Increments Variant(s) For Information Only
case where TAP will be, from the beginning, connected to TANAP at the GR/TR border, and IGB will be supplied by the DESFA network therefore the C/S will supply gas to the DESFA system and the ones of neighbouring operators through IGB.
Variant : 206.40 GWh/d
Point
Operator DESFA S.A.
Year 2020
From Gas System To Gas System Capacity
157.8 GWh/d
TRi
IB-GRk
Kipi (TR) / Kipi (GR)
Comment: 6 bcm/y